A technician walks several kilometres a shift without leaving the building. Layout decides how much of it is work.

Fetched from stores Stocked at the bay 1.8 km a shift 0.4 km a shift

Ask a workshop owner where their time goes and they will talk about diagnostics, parts delays, customers who will not answer the phone. Almost nobody says walking. Yet motion is one of the seven wastes Taiichi Ohno named at Toyota, and on a workshop floor it is the one nobody measures because it never looks like idleness. A technician crossing the shop for a socket is visibly busy the entire time.

Draw the spaghetti

The classic tool is older than lean itself: the spaghetti diagram. Take a floor plan, pick one technician, and draw a line everywhere they walk for two hours. Do not tidy it. The tangle that results is the point โ€” Frank and Lillian Gilbreth were doing the same thing with motion studies before 1920, filming bricklayers and cutting the motions per brick from eighteen to about five by rearranging the materials rather than hurrying the worker.

Shops that run this exercise honestly tend to find the same four culprits:

  • The parts counter is central to the building, not to the work. It was placed where it suited the reception desk.
  • Consumables live in one place. One roll of shop towel, one brake cleaner, both at the far wall.
  • The printer is in the office. Every job card, every inspection sheet, is a round trip.
  • Diagnostic equipment is shared and stored, not stationed. It goes back to a cupboard after every use.

The theory underneath

Two ideas do most of the work here.

Point-of-use storage. Lean says a tool belongs where the work happens, not where storage is tidiest. Five brake cleaners, one per bay, look wasteful on a stock sheet and save a kilometre a day. The cost of the extra stock is trivially calculable; the cost of the walking is invisible, which is exactly why the wrong one wins.

Cellular layout. Manufacturing moved from process layout โ€” all the lathes together, all the mills together โ€” to cells that contain everything one job needs. A workshop organised by equipment type is a process layout. A bay stocked so a standard service never requires leaving it is a cell. Most shops are somewhere in between and have never named which they are aiming at.

The classical example worth knowing

The most cited case is not a factory. In the 1990s, hospitals applying these ideas to operating theatres found that surgical teams were walking to fetch instruments mid-procedure. Reorganising around point-of-use trays cut turnaround times substantially โ€” without anybody working faster. That is the shape of the result you should expect: the work does not speed up, the gaps between work close.

What to actually do this month

  1. Spaghetti one technician for two hours. Pen and paper. Do not announce it as a study; just ask.
  2. Count the trips, not the metres. Twenty trips to the parts counter matters more than their length, because each one is also a context switch.
  3. Fix the single worst trip first. Usually consumables. Duplicating a five-dollar item per bay is the cheapest improvement available to you.
  4. Re-draw it a month later. If the tangle has not visibly loosened, you moved the wrong thing.

One caution. Layout changes feel productive and are easy to over-do; a shop that rearranges itself every quarter pays the disruption cost repeatedly. Change one thing, let it settle, measure again. And if your constraint is a single hoist rather than motion, this entire exercise is the hour saved in the wrong place โ€” go back and read the constraint post first.

Shared storage Stocked at the bay bay parts towels printer cleaner bay cart printer

What this takes to measure

CapabilityFromWhy
Time logs per jobstarterWalking shows up as the gap between job stages, not as idle time
Bay and technician assignmentstarterTells you which bay a job actually ran in, so a layout change can be measured
Inventory by locationproPoint-of-use stocking needs stock counted per location, not per shop

Further reading

  • Taiichi Ohno โ€” Toyota Production System โ€” the seven wastes, motion among them
  • Frank and Lillian Gilbreth โ€” Motion study โ€” the origin of this way of looking at work
  • Mike Rother and John Shook โ€” Learning to See โ€” value stream mapping, the companion tool